The withdrawal from nuclear energy use and the envisaged withdrawal from coal energy by the end of 2030 means that new power generation plants will have to be built in the coming years. The plants in question concern above all renewable energies, but they will also include flexible gas power plants that can be used to bridge the gap when there is no available power from renewable sources. But how can the necessary investments in new power plants be refinanced? Which incentive instruments can policy set for these extensions without driving energy prices up further?

In a short study on behalf of the vbw – Bavarian Industry Association, we assessed the suitability of various political instruments.

Balance of affordability and security of supply

Residual power plants

It is not possible to finance the building of so-called residual power plants – that can assist if power from renewable sources is not sufficient – through energy sales alone. We compared the different incentive instruments for the building of these flexible gas power plants.

The “selective capacity mechanism” seems to be the most well suited to this and means that a power plant is refinanced in the way that is most cost effective for energy customers: The power plants receive payment for the provision of their capacity, in addition to their earnings for delivering electricity to the energy market.

So that the additionally built gas power plants can be operated in a way that is greenhouse gas neutral in the long term, they must also have the technical capacity to use hydrogen. However, the implementation of additional instruments will be required to avoid the rises in electricity prices that would otherwise result from the higher costs of converting hydrogen to electricity.

Renewable energies

Renewable energies should continue to be subsidised.

In the EU, discussions are under way about Contracts for Difference, which could be used to refinance the subsidies for renewables. The Contracts for Difference guarantee renewable energy plants a minimum price for their supplied energy. The difference between the minimum price and the market price is taken care of through state-guaranteed mechanisms.

At the same time, price caps will also be established. If the price lies above these agreed price caps, the proceeds are skimmed. Our short study concludes that this instrument should be implemented imminently.

Electricity price area

The division of the uniform electricity price area results in theoretical cost advantages for the energy system, which, however, are counteracted by macroeconomic disadvantages in the practical implementation. In order to decide in favour of this or another solution political and economic aspects also need to be examined.

The imminent implementation of the grid expansion is, however, a fundamental condition for the preservation of the universal electricity price area. Already today there are cost differences relevant to network charges, which tend to be higher in the regions with a high share of electricity generated with renewables. A reform of network charges could possibly achieve much bigger incentives for system efficiency than a division of the universal electricity price area.

Our approach

Our short study examines political instruments that could drive the energy market transformation forward. For this purpose, specific aspects of these instruments were collected and quantitatively assessed. The electricity price forecasts for summer 2023, compiled on behalf of the vbw, was used as a basis. The current expansion goals of the Renewable Energy Act were taken into consideration in the modelling of energy prices.

Links and downloads

To the study (PDF in German)

Project team: Sven Kreidelmeyer

Last update: 27.02.2024

Do you have questions?

Your contact at Prognos

Sven Kreidelmeyer

Project Manager

View profile

Mehr Studien & Projekte zu diesem Thema

More studies & projects on this topic

Scenario analysis for the long-term strategy Negative emissions

ongoing
| Project

Prognos is preparing a scenario analysis for dena and the BMWK to calculate the demand for and potential of negative emissions in Germany.

Policy scenarios for the 2025-2027 projection reports

ongoing
| Project

Prognos and its partners support the preparation of the German government's 2025 to 2027 greenhouse gas projection reports.

Regulatory check for sales products in the energy industry

2024
| Project

Prognos supported an energy supplier with integrating sustainability requirements into the sales department’s product decision process.

Climate protection investments for the transformation of the energy system

2024
| Project

On behalf of the Federal Ministry for Economic Affairs and Climate Action, we calculated the investments that will be required to restructure capital stock in the course of the envisaged net zero transition.

Cost effectiveness of energy-efficiency housing refurbishment

2024
| Project

On behalf of the WWF Germany, using 32 case studies, we calculated the cost effectiveness of refurbishment measures for detached houses and apartment buildings.

Regulatory requirements for carbon accounting

2024
| Project

Which carbon accounting requirements will businesses have to be aware of in the future and what, specifically, will present the greatest challenge?

Greenhouse gas projections 2024 expert appraisal

2024
| Project

For the Council of Experts on Climate Change we conducted an expert appraisal to review the Federal Environment Agency’s greenhouse gas projection data.

Reducing emissions in primary industry

2024
| Project

Primary industry will have to achieve massive reductions in CO2 output by 2045. The Office of Technology Assessment commissioned Prognos with demonstrating the opportunities for a successful transformation.

Scenarios for calculating the cost of Germany’s transport transition

2024
| Project

What level of investment will be required to ensure a climate-neutral transport sector by 2045? We calculated this on behalf of Agora Verkehrswende, based on three scenarios.

Energy efficiency gap analysis

2024
| Project

Energy consumption for industry, buildings and transport has remained relatively stable for the last 20 years. A study for the German Industry Initiative for Energy Efficiency (DENEFF) shows how policy can use efficiency measures to counteract this stagnation.

About us

Prognos – Providing Orientation.

Prognos is one of the oldest economic research centres in Europe. Founded at the University of Basel, Prognos experts have been conducting research for a wide range of clients from the public and private sectors since 1959 – politically independent, scientifically sound.

Learn more